Connect with us

Technology

Nasa’s mega-rocket that will take humans to the Moon AND Mars is ‘ready to launch’ – and seen in rare photo

NASA is getting ready to test out its mega-rocket in a “wet dress rehearsal” for an upcoming Moon mission.

All the components for the Artemis I mission have been cleared to roll out to the launch pad at the Kennedy Space Center in Cape Canaveral, Florida.

NASAWork platforms are being removed from the Artemis I Space Launch System rocket and Orion spacecraft[/caption]

NASAPlatforms were previously surrounding the rocket[/caption]

Nasa’s 2022 mission to the Moon is called Artemis 1.

It will be testing out hardware so that Nasa can land the first woman and the first person of color on the Moon by 2025.

That crewed mission is being referred to as Artemis 3 and a lot has to happen before it can take place.

Before Artemis 1 can launch, Nasa wants to test all the components.

Read more on Nasa

DON’T LOOK UP

Nasa reveals it ‘secretly’ prepared for asteroid smashing into Earth scenario

RAINBOW SMILE

Nasa reveals stunning image of upside down rainbow – here’s how it was formed

All the major pieces should all be at the launch pad on March 17.

Artemis 1 isn’t a crewed mission but it needs to loop around the Moon to test three key components.

These are Nasa’s Space Launch System (SLS), its Orion spacecraft, and the European Service Module (ESM).

The Orion spacecraft and the ESM should get within 62 miles of the lunar surface and then travel 40,000 miles beyond this.


It will take about three weeks for it to complete the mission and land in the Pacific Ocean off San Diego.

Nasa also refers to the Orion spacecraft and SLS as the “Mega Moon rocket”

It will take about 11 hours to take the mega-rocket from its storage location to the launch pad.

Once there, Nasa has said it will take about two weeks for experts to prepare for the “wet dress rehearsal”.

This means propellant will be added to the rocket tanks and a full launch countdown will take place.

That should take place in early April.

However, Nasa’s SLS and Orion spacecraft won’t be going anywhere.

How the equipment behaves will determine when Artemis 1 can actually take off.

Tom Whitmeyer, deputy associate administrator for exploration systems development at Nasa, previously said: “The agency is waiting to for the wet dress rehearsal to see how we’re doing … we’ll set the launch date at that point.

“We continue to evaluate the May launch window, but we recognize that there’s a lot of work in front of us and we need to make sure we get through that testing and evaluation activity before we set a launch commitment date.”

If all goes to plan, all the equipment will be wheeled back into the Vehicle Assembly Building and a launch date will finally be set.

This could be almost any time in May, June or early July.

It all depends on weather conditions and where the Moon is in its lunar cycle.

Possible launch windows are May 7-21, June 6-16, June 29-July 1 and July 5-12 of this year.

Read More on The US Sun

BABY #4!

Kourtney reveals she’s ‘trying for a baby’ with Travis in Hulu show trailer

LEGEND LOST

WWE icon dead at 63 after life support turned off for ‘Razor Ramon’

You can watch the Artemis I rollout beginning on March 17 at 5pm ET.

Nasa’s website will be providing a livestream.

We pay for your stories!

Do you have a story for The US Sun team?

Email us at exclusive@the-sun.com or call 212 416 4552.

Like us on Facebook at www.facebook.com/TheSunUS and follow us from our main Twitter account at @TheSunUS

Exit mobile version